In 1994 Adtech supplied and installed a GRE test line on Barrow Island to replace a highly corrosive carbon steel pipeline. After time in test it was deemed a complete success and a decision was made to continually replace all the steel flowlines on the island with Centron GRE pipe. Adtech supplied and installed Centron pipe on Barrow Island with continual success and Centron GRE pipe is still be supplied and installed on Barrow Island late 2012 ongoing. This project is the largest above ground GRE installation in the world.