Beach Energy

45,000m Supply and install 5’’ Centron GRE Pipe.

Beach Energy commissioned Adtech to Supply and Install the Callawonga to Tantanna oil pipeline in 2008. This pipeline is still in service and the installation was deemed to be such an installation breakthrough with GRE Pipe Specific designed installation equipment , that an award from the manufacturer was presented to Adtech for the most metres per day ever installed  anywhere in the world.