Case

14

Beach Energy & Cooper Energy Limited

4,692 metres Supply and Install 5” Centron Pipe Crude Oil

This pipeline connected the Balgowan Wellhead with the Stunsail Facility. The oil is then transported through the Stunsail to Bauer pipeline for shipping to Moomba. Completed July 2015.
Ph: +61 (0) 8 9262 7000