Case

11

Beach Energy & Cooper Energy Limited

4,150 metres Supply and Install 6” Centron Pipe Crude Oil

This pipeline connected the Windmill production lease with the Callawonga Oil Facility. The oil is then transported to Lycium Facility for shipping to Moomba through the 8” Centron trunkline to Moomba. Completed December 2013
Ph: +61 (0) 8 9262 7000