Beach Energy & Drillsearch JV
47,000 metres Supply and Install 6” Centron Pipe Crude Oil
More Info09
47,000 metres Supply and Install 6” Centron Pipe Crude Oil
More Info08
In 1994 Adtech supplied and installed a GRE test line on Barrow Island to replace a highly corrosive carbon steel pipeline.
More Info07
Santos CO2 Removal – GRE Raw Water Line Installation at Moomba, SA. Completed December 2014.
More Info06
60,000 metres Supply and Install 6’’ Centron Pipe Crude Oil
More Info05
This project involves the largest diameter GRE pipeline for Hydrocarbon service (Gas) installed to AS2885 to date. Connects the Arrow MGF plant with the Dyno Nobel Ammonia Nitrate plant.
More Info04
33,000 metres Supply and Install 10’’ Centron Pipe Gas Service
More Info